NH-130CD Economic Corridor

Odisha & Andhra Pradesh · Detailed engineering design

Six-lane viaduct crossing an interchange loop, aerial view
Fig. 01 · 6-Lane NH-130CD, Raipur–Visakhapatnam Economic Corridor

₹3,738Cr

Project cost

121km

Across three packages

50

Major structures

6lane

Access-controlled carriageway

Overview

Detailed engineering design for packages 01, 05 and 06 of the 6-lane Raipur–Visakhapatnam Economic Corridor.

Access-controlled greenfield alignments designed for value engineering: slope stability, cut-and-fill protection and toll plaza siting resolved inside the detailed design stage.

Scope delivered

  • Highway geometry
  • Drainage and hydraulics
  • Interchanges and viaducts
  • Major and minor bridges, underpasses and culverts
  • Toll plazas
  • Road safety, signage and noise barriers

Packages

Three packages, 121 km

Two packages in Odisha and one in Andhra Pradesh, with the structures each one carries.

PackageCorridorLengthStructuresCost
Kaligura–Baunsagaur, OD-56-Lane NH-130CD, Odisha44.00 km3 interchanges, 13 viaducts, 4 major bridges, 13 minor bridges₹3,738 Cr
Baunsagaur–Baraja, OD-66-Lane NH-130CD, Odisha45.50 km3 interchanges, 3 viaducts, 1 ROB, 4 major bridges, 19 minor bridgesIncl. above
Aluru–Jakkuva, AP-16-Lane NH-130CD, Andhra Pradesh31.76 km1 interchange, 12 viaducts, 3 major bridges, 13 minor bridgesIncl. above